SOLAR + STORAGE Β· MISO

Solar + storage project J2903, Lincoln County

Solar + storage project J2903, Lincoln County is a 130 MW solar + storage request withdrawn in the MISO interconnection queue, in Lincoln County, Mississippi, connecting to COOPERATIVE ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2903
Grid region
MISO (Midcontinent)
Utility / transmission owner
COOPERATIVE ENERGY
Connection point (POI)
BROOKHAVEN - BROOKHAVEN/SOUTH 115.0kV
Location
Lincoln County, Mississippi
Technology
Solar: 130 MW Β· Battery
Total requested
130 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
9 September 2022
Proposed online date
February 2025
Withdrawn
July 2025

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem