United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
GAS Β· SOUTHEASTGas project 22, Calhoun County
Gas project 22, Calhoun County is a 450 MW gas request withdrawn in the Southeast interconnection queue, in Calhoun County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2003 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Calhoun County, South Carolina
- Technology
- Gas: 450 MW
- Total requested
- 450 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 30 October 2003
Location
Marker shows the centre of Calhoun County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Calhoun County
- Solar project 20220429001, Calhoun CountySolar Β· 75.0 MW Β· in study
- Gas project 20211117001, Calhoun CountyGas Β· 50.0 MW Β· in study
- Gas project 20211104002, Calhoun CountyGas Β· 23.0 MW Β· in study
- Solar project 20240829017, Calhoun CountySolar Β· 115 MW Β· withdrawn
- Solar + storage project 20210311001, Calhoun CountySolar + storage Β· 115 MW Β· withdrawn
- Solar project 20230828006, Calhoun CountySolar Β· 115 MW Β· withdrawn
- Solar project 212, Calhoun CountySolar Β· 74.8 MW Β· withdrawn
- Solar project 20230828005, Calhoun CountySolar Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem