United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· WEST

Solar project 2022-G7

Solar project 2022-G7 is a 80.0 MW solar request in interconnection study in the West interconnection queue, connecting to WAPA Rocky Mountain Region.

Queue statusIn planning
  1. PlanningQueued May 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget May 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2022-G7
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA Rocky Mountain Region
Connection point (POI)
Sand Creek 115-kV Switching Station
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Study phase
In Progress
Queue status
Active
Entered queue
26 May 2022
Proposed online date
May 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem