United States βΊ Grid βΊ Interconnection queues
GAS Β· ERCOTElk 2
Elk 2 is a 202 MW gas request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 15INR0032
- Grid region
- ERCOT (Texas)
- Developer
- Golden Spread Elec Coop
- Connection point (POI)
- Abernathy (79506)
- Technology
- Gas: 202 MW
- Total requested
- 202 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 28 January 2013
- Agreement signed
- 13 December 2013
- Proposed online date
- June 2016
- Came online
- June 2016
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem