SOLAR Β· ERCOT

Trigo Solar Project

Trigo Solar Project is a 146 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0204
Grid region
ERCOT (Texas)
Developer
Ignis TX Solar Two LLC
Connection point (POI)
5705 Fowlerton 138kV
Technology
Solar: 146 MW
Total requested
146 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
7 January 2022
Proposed online date
December 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem