United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
GAS Β· MISOGas project J3445, Olmsted County
Gas project J3445, Olmsted County is a 49.0 MW gas request withdrawn in the MISO interconnection queue, in Olmsted County, Minnesota, connecting to GridUnity.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3445
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GridUnity
- Connection point (POI)
- Westside
- Location
- Olmsted County, Minnesota
- Technology
- Gas: 49.0 MW
- Total requested
- 49.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 11 April 2024
- Proposed online date
- August 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Olmsted County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Olmsted County
- Solar project J1124, Olmsted CountySolar Β· 100 MW Β· under construction
- Gas project J485, Olmsted CountyGas Β· 46.9 MW Β· agreement signed
- Sandhill Energy StorageBattery storage Β· 214 MW Β· in study
- Solar project J3039, Olmsted CountySolar Β· 200 MW Β· in study
- Battery storage project J2840, Olmsted CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J1898, Olmsted CountyBattery storage Β· 200 MW Β· in study
- Solar project J3041, Olmsted CountySolar Β· 200 MW Β· in study
- Solar + storage project J2219, Olmsted CountySolar + storage Β· 180 MW Β· in study
- Battery storage project J2731, Olmsted CountyBattery storage Β· 150 MW Β· in study
- Solar project J1534, Olmsted CountySolar Β· 100 MW Β· in study
- Mount Simon StationGas Β· 49.5 MW Β· in study
- Onshore wind project G883, Olmsted CountyOnshore wind Β· 1,500 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem