BATTERY STORAGE Β· MISOBattery storage project J3537, Kalamazoo County
Battery storage project J3537, Kalamazoo County is a 265 MW battery storage request withdrawn in the MISO interconnection queue, in Kalamazoo County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3537
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Weeds Lake 138kV substation (Bus Number 256510)
- Location
- Kalamazoo County, Michigan
- Technology
- Battery: 265 MW
- Total requested
- 265 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 16 April 2024
- Proposed online date
- June 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Kalamazoo County; the queue data does not give exact sites.
Other requests in Kalamazoo County
- Gas project J571, Kalamazoo CountyGas Β· 6.4 MW Β· agreement signed
- Solar project J2814, Kalamazoo CountySolar Β· 220 MW Β· in study
- Battery storage project J2906, Kalamazoo CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J1894, Kalamazoo CountyBattery storage Β· 200 MW Β· in study
- Gas project J561, Kalamazoo CountyGas Β· 190 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem