United States βΊ Grid βΊ Interconnection queues
SOLAR + STORAGE Β· ERCOTOutpost Solar
Outpost Solar is a 517 MW solar + storage request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 23INR0007
- Grid region
- ERCOT (Texas)
- Developer
- Hecate Energy Outpost Solar LLC
- Connection point (POI)
- Tap 345kV 80219 Lobo - 5709 Fowlerton
- Technology
- Solar: 517 MW Β· Battery
- Total requested
- 517 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 6 December 2019
- Agreement signed
- 11 January 2022
- Proposed online date
- August 2025
- Came online
- August 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem