SOLAR + STORAGE Β· ERCOT

Outpost Solar

Outpost Solar is a 517 MW solar + storage request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Dec 2019 (completed)
  2. ConsentedJan 2022 (completed)
  3. Construction (completed)
  4. OperatingAug 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
23INR0007
Grid region
ERCOT (Texas)
Developer
Hecate Energy Outpost Solar LLC
Connection point (POI)
Tap 345kV 80219 Lobo - 5709 Fowlerton
Technology
Solar: 517 MW Β· Battery
Total requested
517 MW
Study phase
IA
Queue status
Operational
Entered queue
6 December 2019
Agreement signed
11 January 2022
Proposed online date
August 2025
Came online
August 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem