ONSHORE WIND Β· ERCOTPenascal Wind Farm 1
Penascal Wind Farm 1 is a 202 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 06INR0022a
- Grid region
- ERCOT (Texas)
- Developer
- Heartland Wind LLC
- Connection point (POI)
- PENA_UNIT1 34.500
- Technology
- Wind: 202 MW
- Total requested
- 202 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 20 December 2004
- Agreement signed
- 28 August 2007
- Proposed online date
- April 2009
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem