United States β€Ί Grid β€Ί Interconnection queues β€Ί Idaho

BATTERY STORAGE Β· WEST

Battery storage project 778, Owyhee County

Battery storage project 778, Owyhee County is a 190 MW battery storage request withdrawn in the West interconnection queue, in Owyhee County, Idaho, connecting to Idaho Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2025 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
778
Grid region
West (non-ISO utilities)
Utility / transmission owner
Idaho Power Company
Connection point (POI)
Hemingway 230kV Substation
Location
Owyhee County, Idaho
Technology
Battery: 190 MW
Total requested
190 MW
Service type
NRIS and ERIS
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
14 April 2025

Location

Marker shows the centre of Owyhee County; the queue data does not give exact sites.

Power plants in Idaho Β· Transmission lines in Idaho

Other requests in Owyhee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem