ONSHORE WIND Β· WESTOnshore wind project G0561, Benton County
Onshore wind project G0561, Benton County is a 250 MW onshore wind request withdrawn in the West interconnection queue, in Benton County, Washington.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0561
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Badger Canyon Substation 115/230 kV. Alternates: Red Mountain Substation 115 kV; A tap on the Franklin-McNary 230 kV transmission line.
- Location
- Benton County, Washington
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 3 May 2017
- Proposed online date
- October 2020
Location
Marker shows the centre of Benton County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Benton County
- Solar + storage project G0822, Benton CountySolar + storage Β· 4,000 MW Β· in study
- Nuclear project G0998, Benton CountyNuclear Β· 1,120 MW Β· in study
- Solar + storage project G0670, Benton CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project G0688, Benton CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project G1040, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0932, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1037, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1039, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0920, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0933, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G1038, Benton CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project G0684, Benton CountySolar + storage Β· 705 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem