United States βΊ Grid βΊ Interconnection queues βΊ Kentucky
SOLAR Β· SOUTHEASTSolar project LGE-GIS-2020-002, Mercer County
Solar project LGE-GIS-2020-002, Mercer County is a 105 MW solar request withdrawn in the Southeast interconnection queue, in Mercer County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- LGE-GIS-2020-002
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Louisville Gas & Electric and Kentucky Utilities Energy
- Connection point (POI)
- Harrodsburg - West Cliff 69kV
- Location
- Mercer County, Kentucky
- Technology
- Solar: 105 MW
- Total requested
- 105 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 3 November 2020
- Proposed online date
- December 2024
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Other requests in Mercer County
- Gas project LGE-GIS-2023-002, Mercer CountyGas Β· 660 MW Β· agreement signed
- Solar project LGE-GIS-2019-025, Mercer CountySolar Β· 99.0 MW Β· agreement signed
- Solar project LGE-GIS-2014-001, Mercer CountySolar Β· 10.0 MW Β· agreement signed
- Hydro project LGE-GIS-2011-005, Mercer CountyHydro Β· 6.0 MW Β· agreement signed
- Battery storage project LGE-GIS-2023-003, Mercer CountyBattery storage Β· 125 MW Β· in study
- Solar project LGE-GIS-2024-004, Mercer CountySolar Β· 22.0 MW Β· in study
- Gas project LGE-GIS-2011-004, Mercer CountyGas Β· 880 MW Β· withdrawn
- Gas project LGE-GIS-2022-011, Mercer CountyGas Β· 660 MW Β· withdrawn
- Gas project LGE-GIS-2022-004, Mercer CountyGas Β· 660 MW Β· withdrawn
- Gas project LGE-GIS-2021-006, Mercer CountyGas Β· 635 MW Β· withdrawn
- Other project G004, Mercer CountyOther Β· 174 MW Β· withdrawn
- Battery storage project LGE-GIS-2023-001, Mercer CountyBattery storage Β· 125 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem