United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTSage Geosystems SMECI
Sage Geosystems SMECI is a 3.0 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0825
- Grid region
- ERCOT (Texas)
- Developer
- Sage Geosystems, INC
- Connection point (POI)
- 28.65234, -98.51064
- Technology
- Other Storage: 3.0 MW
- Total requested
- 3.0 MW
- Study phase
- No MRD
- Queue status
- Withdrawn
- Proposed online date
- December 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem