United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Sage Geosystems SMECI

Sage Geosystems SMECI is a 3.0 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0825
Grid region
ERCOT (Texas)
Developer
Sage Geosystems, INC
Connection point (POI)
28.65234, -98.51064
Technology
Other Storage: 3.0 MW
Total requested
3.0 MW
Study phase
No MRD
Queue status
Withdrawn
Proposed online date
December 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem