ONSHORE WIND Β· ERCOT

Grandview (Last) W

Grandview (Last) W is a 750 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
13INR0006
Grid region
ERCOT (Texas)
Developer
Eon
Connection point (POI)
79000 Gray 345kV
Technology
Wind: 750 MW
Total requested
750 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
26 March 2009
Proposed online date
December 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem