United States βΊ Grid βΊ Interconnection queues βΊ Missouri
BATTERY STORAGE Β· SPPBattery storage project GEN-2022-080, Cedar County
Battery storage project GEN-2022-080, Cedar County is a 96.0 MW battery storage request withdrawn in the SPP interconnection queue, in Cedar County, Missouri, connecting to EDE.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-080
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- EDE
- Connection point (POI)
- Dadeville East - Bolivar South 161kV
- Location
- Cedar County, Missouri
- Technology
- Battery: 96.0 MW
- Total requested
- 96.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 22 September 2022
- Proposed online date
- October 2027
- Withdrawn
- March 2025
Location
Marker shows the centre of Cedar County; the queue data does not give exact sites.
Other requests in Cedar County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem