United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-080, Cedar County

Battery storage project GEN-2022-080, Cedar County is a 96.0 MW battery storage request withdrawn in the SPP interconnection queue, in Cedar County, Missouri, connecting to EDE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedMar 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-080
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
EDE
Connection point (POI)
Dadeville East - Bolivar South 161kV
Location
Cedar County, Missouri
Technology
Battery: 96.0 MW
Total requested
96.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
22 September 2022
Proposed online date
October 2027
Withdrawn
March 2025

Location

Marker shows the centre of Cedar County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Cedar County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem