United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

ONSHORE WIND Β· SOUTHEAST

Onshore wind project GI-37, Clinton County

Onshore wind project GI-37, Clinton County is a 201 MW onshore wind request withdrawn in the Southeast interconnection queue, in Clinton County, Missouri, connecting to Associated Electric Cooperative, Incorporated.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-37
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Associated Electric Cooperative, Incorporated
Connection point (POI)
Osborn 161 kV Bus
Location
Clinton County, Missouri
Technology
Wind: 201 MW
Total requested
201 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
17 June 2009
Proposed online date
May 2010

Location

Marker shows the centre of Clinton County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Clinton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem