United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
GAS Β· SOUTHEASTGas project IC-003, Lowndes County
Gas project IC-003, Lowndes County is a 500 MW gas request withdrawn in the Southeast interconnection queue, in Lowndes County, Mississippi, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedAug 2001 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-003
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Miller - Lowndes 500 kV Tie-line
- Location
- Lowndes County, Mississippi
- Technology
- Gas: 500 MW
- Total requested
- 500 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Withdrawn
- August 2001
Location
Marker shows the centre of Lowndes County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Lowndes County
- Gas project 569, Lowndes CountyGas Β· 620 MW Β· in study
- Battery storage project 25RSC-013, Lowndes CountyBattery storage Β· 200 MW Β· in study
- Other project 53, Lowndes CountyOther Β· 900 MW Β· built
- Other project 53Other Β· 900 MW Β· built
- Lone Oak Energy Center(Calpine)Gas Β· 813 MW Β· built
- Caledonia Generating (Cogentrix)Gas Β· 813 MW Β· built
- Other project 15, Lowndes CountyOther Β· 450 MW Β· built
- Other project 15Other Β· 450 MW Β· built
- Gas project 223, Lowndes CountyGas Β· 122 MW Β· built
- Solar project 341, Lowndes CountySolar Β· 100 MW Β· built
- Solar project 415, Lowndes CountySolar Β· 100 MW Β· built
- Solar project 377, Lowndes CountySolar Β· 100 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem