ONSHORE WIND Β· ERCOTPenascal Wind Farm 2
Penascal Wind Farm 2 is a 202 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 06INR0022b
- Grid region
- ERCOT (Texas)
- Developer
- PPM Energy, Inc
- Connection point (POI)
- PENA_UNIT2 34.500
- Technology
- Wind: 202 MW
- Total requested
- 202 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 20 December 2004
- Agreement signed
- 8 May 2009
- Proposed online date
- April 2009