United States βΊ Grid βΊ Interconnection queues βΊ New York
OTHER Β· NYISOProject Orange
Project Orange is a 420 MW other request withdrawn in the NYISO interconnection queue, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2000 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 62
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Project Orange Associates, LP
- Connection point (POI)
- Temple St.
- Location
- New York
- Technology
- Other: 420 MW
- Total requested
- 420 MW
- Queue status
- Withdrawn
- Entered queue
- 8 May 2000
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem