πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

BATTERY STORAGE Β· SOUTHEAST

Battery storage project LGE-GIS-2022-010, Bell County

Battery storage project LGE-GIS-2022-010, Bell County is a 216 MW battery storage request withdrawn in the Southeast interconnection queue, in Bell County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2022-010
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
Pineville - Harlan #1 161 kV line
Location
Bell County, Kentucky
Technology
Other Storage: 216 MW
Total requested
216 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
30 September 2022
Proposed online date
December 2030

Location

Marker shows the centre of Bell County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem