United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
GAS Β· SOUTHEASTGas project 957043, Cherokee County
Gas project 957043, Cherokee County is a 500 MW gas request withdrawn in the Southeast interconnection queue, in Cherokee County, South Carolina, connecting to Duke Energy Carolinas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 957043
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- RIVERVIEW SW STA 230 kV
- Location
- Cherokee County, South Carolina
- Technology
- Gas: 500 MW
- Total requested
- 500 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 27 June 2024
Location
Marker shows the centre of Cherokee County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Cherokee County
- Solar project 572354, Cherokee CountySolar Β· 28.3 MW Β· agreement signed
- Gas project 569364, Cherokee CountyGas Β· 757 MW Β· withdrawn
- Gas project 564266, Cherokee CountyGas Β· 757 MW Β· withdrawn
- Gas project 21177, Cherokee CountyGas Β· 741 MW Β· withdrawn
- Gas project 976884, Cherokee CountyGas Β· 400 MW Β· withdrawn
- Gas project 957101, Cherokee CountyGas Β· 156 MW Β· withdrawn
- Solar project 126064, Cherokee CountySolar Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem