SOLAR Β· ERCOT

Capital Group Solar San Antonio

Capital Group Solar San Antonio is a 1.8 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0753
Grid region
ERCOT (Texas)
Developer
The Capital Group San Antonio
Connection point (POI)
Four 2500 KVA CPS service transformers. Existing utility service B243.
Technology
Solar: 1.8 MW
Total requested
1.8 MW
Study phase
No MRD
Queue status
Withdrawn
Entered queue
21 August 2023
Proposed online date
September 2023

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem