United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR + STORAGE Β· MISOSolar + storage project J3115, Sharkey County
Solar + storage project J3115, Sharkey County is a 216 MW solar + storage request withdrawn in the MISO interconnection queue, in Sharkey County, Mississippi, connecting to COOPERATIVE ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3115
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- COOPERATIVE ENERGY
- Connection point (POI)
- Taping the 'Onward / 3ONWARD+ (336967)' to 'Rolling Fork / 3ROLING FRK! (336968)' 115kV line
- Location
- Sharkey County, Mississippi
- Technology
- Solar: 216 MW Β· Battery
- Total requested
- 216 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- June 2026
- Withdrawn
- July 2025
Location
Marker shows the centre of Sharkey County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Sharkey County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem