United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTJavelina 2 Wind
Javelina 2 Wind is a 200 MW onshore wind request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 15INR0049
- Grid region
- ERCOT (Texas)
- Developer
- Nextera
- Connection point (POI)
- 161106-8 Bordas2 34.5kV
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 12 September 2013
- Agreement signed
- 30 December 2015
- Proposed online date
- February 2017
- Came online
- February 2017
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem