SOLAR Β· SOUTHEAST

Solar project LGE-GIS-2019-024, Woodford County

Solar project LGE-GIS-2019-024, Woodford County is a 200 MW solar request withdrawn in the Southeast interconnection queue, in Woodford County, Kentucky, connecting to Louisville Gas & Electric and Kentucky Utilities Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedDec 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
LGE-GIS-2019-024
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Louisville Gas & Electric and Kentucky Utilities Energy
Connection point (POI)
Ghent - Lexington 345 kV Line
Location
Woodford County, Kentucky
Technology
Solar: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
29 March 2019
Proposed online date
December 2022
Withdrawn
December 2019

Location

Marker shows the centre of Woodford County; the queue data does not give exact sites.

Power plants in Kentucky Β· Transmission lines in Kentucky

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem