Onshore wind project J126, Winona County is a 4.9 MW onshore wind request withdrawn in the MISO interconnection queue, in Winona County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2010 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- ConsentedJul 2012 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J126
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- ITC Midwest Rushford - Wilson 69kV
- Location
- Winona County, Minnesota
- Technology
- Wind: 4.9 MW
- Total requested
- 4.9 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 23 April 2010
- Agreement signed
- 20 July 2012
- Proposed online date
- October 2012
- Withdrawn
- July 2012
Location
Marker shows the centre of Winona County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Winona County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem