SOLAR Β· WEST

Solar project 45

Solar project 45 is a 0.4 MW solar request built and operating in the West interconnection queue, connecting to Avista Utilities.

Queue statusOperating
  1. PlanningQueued Jun 2015 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingAug 2015 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
45
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Avista distribution system on the Avista Barker Substation feeder 12F2
Technology
Solar: 0.4 MW
Total requested
0.4 MW
Service type
Network resource (NRIS)
Study phase
IA Executed
Queue status
Operational
Entered queue
1 June 2015
Proposed online date
July 2015
Came online
August 2015

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem