OTHER Β· PJMOther project AB1-031A
Other project AB1-031A is a 25.0 MW other request withdrawn in the PJM interconnection queue, connecting to JCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2015 (completed)
- Withdrawn / abandonedMar 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AB1-031A
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- JCPL
- Connection point (POI)
- LAKEWOOD 18 KV OCEAN C1-ATLANTIC 230 KV REACTR
- Location
- New Jersey
- Technology
- Other: 25.0 MW
- Total requested
- 25.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 July 2015
- Withdrawn
- March 2017
Location
No county location in the queue data.