BATTERY STORAGE Β· ERCOT

Junction North BESS

Junction North BESS is a 9.9 MW battery storage request built and operating in the ERCOT interconnection queue.

Queue statusOperating
  1. PlanningQueued Jun 2023 (completed)
  2. ConsentedSep 2023 (completed)
  3. Construction (completed)
  4. OperatingMar 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
23INR0619
Grid region
ERCOT (Texas)
Developer
SBESS TX 5 LLC
Connection point (POI)
Station Name: New Junction _x000D_ Station Code: P_NEWJUNC_1_ _x000D_ PTI Bus#: 70600_x000D_ Load XFMR Name: PEC Load ID: 1 << The planning cases do not have "Load Names" only a two character Load ID
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
MRD Approved
Queue status
Operational
Entered queue
14 June 2023
Agreement signed
5 September 2023
Proposed online date
November 2024
Came online
March 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem