πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G48, Benton County

Onshore wind project G48, Benton County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Benton County, Washington, connecting to Washington Winds, Inc..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G48
Grid region
West (non-ISO utilities)
Utility / transmission owner
Washington Winds, Inc.
Developer
Washington Winds, Inc.
Connection point (POI)
230 kV Big Eddy-Midway/ 500 kV Hanford-John Day line
Location
Benton County, Washington
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
23 April 2001
Proposed online date
November 2002

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Benton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem