United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

SOLAR + STORAGE Β· MISO

Solar + storage project J3314, Clayton County

Solar + storage project J3314, Clayton County is a 200 MW solar + storage request withdrawn in the MISO interconnection queue, in Clayton County, Iowa, connecting to DAIRYLAND POWER COOPERATIVE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedMay 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3314
Grid region
MISO (Midcontinent)
Utility / transmission owner
DAIRYLAND POWER COOPERATIVE
Connection point (POI)
Postville
Location
Clayton County, Iowa
Technology
Solar: 200 MW Β· Battery
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
17 April 2024
Proposed online date
June 2028
Withdrawn
May 2025

Location

Marker shows the centre of Clayton County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem