United States βΊ Grid βΊ Interconnection queues βΊ Missouri
ONSHORE WIND Β· SPPOnshore wind project GEN-2017-148, Newton County
Onshore wind project GEN-2017-148, Newton County is a 202 MW onshore wind request withdrawn in the SPP interconnection queue, in Newton County, Missouri, connecting to EDE.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2017 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-148
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- EDE
- Connection point (POI)
- Joplin 161kV sub
- Location
- Newton County, Missouri
- Technology
- Wind: 202 MW
- Total requested
- 202 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 27 November 2017
- Proposed online date
- December 2026
- Withdrawn
- October 2023
Location
Marker shows the centre of Newton County; the queue data does not give exact sites.
Other requests in Newton County
- Battery storage project GEN-2022-149, Newton CountyBattery storage Β· 250 MW Β· withdrawn
- Onshore wind project GEN-2020-053, Newton CountyOnshore wind Β· 240 MW Β· withdrawn
- Solar project GEN-2022-113, Newton CountySolar Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2024-037, Newton CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem