United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
SOLAR + STORAGE Β· MISOSolar + storage project J2072, Grant County
Solar + storage project J2072, Grant County is a 100 MW solar + storage request withdrawn in the MISO interconnection queue, in Grant County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2072
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- Woodward 115kV - H.S. EHV 115 kV
- Location
- Grant County, Arkansas
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 23 August 2021
- Proposed online date
- October 2024
- Withdrawn
- March 2025
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Other requests in Grant County
- Solar + storage project J2907, Grant CountySolar + storage Β· 400 MW Β· in study
- Solar project J2134, Grant CountySolar Β· 200 MW Β· in study
- Solar project J2983, Grant CountySolar Β· 140 MW Β· in study
- Solar project J1577, Grant CountySolar Β· 100 MW Β· in study
- Solar project J3481, Grant CountySolar Β· 100 MW Β· in study
- Solar project J3788, Grant CountySolar Β· 100 MW Β· withdrawn
- Battery storage project J2993, Grant CountyBattery storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem