GAS · PJMCentral Heating & Refrigeriation Facility 1 & 2
Central Heating & Refrigeriation Facility 1 & 2 is a 10.0 MW gas request built and operating in the PJM interconnection queue, connecting to PEPCO.
Request details
- Queue ID
- D09
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PEPCO
- Connection point (POI)
- 9th St (sub 117) 13kV
- Location
- District of Columbia
- Technology
- Gas: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 24 July 2000
- Proposed online date
- June 2004
- Came online
- June 2004
Location
No county location in the queue data.
Power plants in District of Columbia · Transmission lines in District of Columbia
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem