United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· MISO

Surplus; Gratiot Solar

Surplus; Gratiot Solar is a 50.0 MW other request in interconnection study in the MISO interconnection queue, connecting to METC.

Queue statusIn planning
  1. PlanningQueued Apr 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1019
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Redstone 138kV
Technology
Solar: 50.0 MW Β· Other
Total requested
50.0 MW
Queue status
Active
Entered queue
25 April 2022
Proposed online date
September 2023

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem