United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ISO-NE

Wind Project-Phase 2( MPS Queue # 2&3)

Wind Project-Phase 2( MPS Queue # 2&3) is a 250 MW onshore wind request withdrawn in the ISO-NE interconnection queue, connecting to MPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2006 (completed)
  2. Withdrawn / abandonedSep 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
168
Grid region
ISO-NE (New England)
Utility / transmission owner
MPS
Connection point (POI)
Maine Public Service System, upgrades include tap
Technology
Wind: 250 MW
Total requested
250 MW
Service type
Other
Queue status
Withdrawn
Entered queue
11 August 2006
Proposed online date
September 2012
Withdrawn
September 2009

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem