United States βΊ Grid βΊ Interconnection queues βΊ Washington
GAS Β· WEST600 MW Monroe-Custer
600 MW Monroe-Custer is a 600 MW gas request withdrawn in the West interconnection queue, in Skagit County, Washington, connecting to Calpine Energy Services, L.P..
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G38
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Calpine Energy Services, L.P.
- Developer
- Calpine Energy Services, L.P.
- Connection point (POI)
- Monroe-Custer 500 kV line near Sedro Wooley
- Location
- Skagit County, Washington
- Technology
- Gas: 600 MW
- Total requested
- 600 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 22 March 2001
- Proposed online date
- June 2005
Location
Marker shows the centre of Skagit County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Skagit County
- Battery storage project 87, Skagit CountyBattery storage Β· 200 MW Β· agreement signed
- Gas project 153, Skagit CountyGas Β· 188 MW Β· in study
- Onshore wind project G0992, Skagit CountyOnshore wind Β· 131 MW Β· in study
- Battery storage project 146, Skagit CountyBattery storage Β· 100 MW Β· in study
- Battery storage project 150, Skagit CountyBattery storage Β· 100 MW Β· in study
- Other project 15, Skagit CountyOther Β· 0.8 MW Β· in study
- Battery storage project 103, Skagit CountyBattery storage Β· 200 MW Β· suspended
- Hydro project 10, Skagit CountyHydro Β· 85.0 MW Β· built
- Other project 4, Skagit CountyOther Β· 31.0 MW Β· built
- Hydro project 35, Skagit CountyHydro Β· 30.4 MW Β· built
- Hydro project 35 (PSE Merchant)Hydro Β· 30.4 MW Β· built
- Gas project 23, Skagit CountyGas Β· 367 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem