United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOCrossbuck Energy Storage LLC
Crossbuck Energy Storage LLC is a 100 MW battery storage request withdrawn in the NYISO interconnection queue, in Greene County, New York, connecting to CHG&E.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1471
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHG&E
- Developer
- Crossbuck Energy Storage LLC
- Connection point (POI)
- Coxsackie 69 kV substation
- Location
- Greene County, New York
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Queue status
- Withdrawn
- Entered queue
- 22 November 2022
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Flint Mine SolarSolar · 100 MW · in study
- Greene County 1Solar · 20.0 MW · in study
- Greene County 2Solar · 10.0 MW · in study
- Athens GenGas · 1,080 MW · built
- Athens GenGas · 1,080 MW · built
- Leeds BESS ProjectBattery storage · 600 MW · withdrawn
- Athens Energy StorageBattery storage · 300 MW · withdrawn
- Athens Energy StorageBattery storage · 300 MW · withdrawn
- NY Catskill 0 Route 9W StorageBattery storage · 245 MW · withdrawn
- Kce NY 35Battery storage · 200 MW · withdrawn
- Hudson Energy StorageBattery storage · 200 MW · withdrawn
- Chateauguay BESSBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem