SOLAR Β· MISOSolar project J4197, Drew County
Solar project J4197, Drew County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Drew County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2025 (completed)
- Withdrawn / abandonedJan 2026 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J4197
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- MONTICELLO EAST - REED SS 115.0kV
- Location
- Drew County, Arkansas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 5 September 2025
- Proposed online date
- October 2030
- Withdrawn
- January 2026
Location
Marker shows the centre of Drew County; the queue data does not give exact sites.
Other requests in Drew County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem