United States β€Ί Grid β€Ί Interconnection queues

GAS Β· ERCOT

SPC Jackson G

SPC Jackson G is a 916 MW gas request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2013 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedSep 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
17INR0003
Grid region
ERCOT (Texas)
Developer
Southern Power Company
Connection point (POI)
New sub tapping both Elm Creek (5133) - STP (5915) 345kV lines, about 92 miles E of Elm Creek
Technology
Gas: 916 MW
Total requested
916 MW
Study phase
IA
Queue status
Withdrawn
Entered queue
2 January 2013
Agreement signed
9 September 2014
Proposed online date
June 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem