United States βΊ Grid βΊ Interconnection queues
GAS Β· ERCOTSPC Jackson G
SPC Jackson G is a 916 MW gas request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedSep 2014 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 17INR0003
- Grid region
- ERCOT (Texas)
- Developer
- Southern Power Company
- Connection point (POI)
- New sub tapping both Elm Creek (5133) - STP (5915) 345kV lines, about 92 miles E of Elm Creek
- Technology
- Gas: 916 MW
- Total requested
- 916 MW
- Study phase
- IA
- Queue status
- Withdrawn
- Entered queue
- 2 January 2013
- Agreement signed
- 9 September 2014
- Proposed online date
- June 2018