United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project G0746, Benton County

Solar + storage project G0746, Benton County is a 150 MW solar + storage request withdrawn in the West interconnection queue, in Benton County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0746
Grid region
West (non-ISO utilities)
Connection point (POI)
Primary POI: Franklin - Hedges No 1 115 kV line. Secondary POI: McNary-Berrian No 1 tap to McNary-Badger Canyon No 1 115 kV line
Location
Benton County, Washington
Technology
Solar: 75.0 MW Β· Battery: 75.0 MW
Total requested
150 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
25 May 2022
Proposed online date
December 2025

Location

Marker shows the centre of Benton County; the queue data does not give exact sites.