United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Chestertown BESS

Chestertown BESS is a 20.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Warren County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2020 (completed)
  2. Withdrawn / abandonedApr 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1101
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
Saturn Energy Storage LLC
Connection point (POI)
Chestertown-Warrensburg #6
Location
Warren County, New York
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
1 October 2020
Withdrawn
April 2021

Location

Marker shows the centre of Warren County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Warren County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem