πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

OTHER Β· NYISO

Grace Corona Generation

Grace Corona Generation is a 79.9 MW other request withdrawn in the NYISO interconnection queue, connecting to CONED.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
130
Grid region
NYISO (New York)
Utility / transmission owner
CONED
Developer
Electrotek Concepts, Inc.
Connection point (POI)
Corona
Location
New York
Technology
Other: 79.9 MW
Total requested
79.9 MW
Queue status
Withdrawn
Entered queue
14 January 2003

Location

No county location in the queue data.

Power plants in New York Β· Transmission lines in New York

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem