OTHER Β· PJMOther project V4-030
Other project V4-030 is a 350 MW other request built and operating in the PJM interconnection queue, connecting to ComEd.
Request details
- Queue ID
- V4-030
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Byron 2-NI Hub
- Technology
- Other: 350 MW
- Total requested
- 350 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: System Impact Study, Facilities Study
- Queue status
- Operational
- Entered queue
- 8 December 2009
- Proposed online date
- May 2012
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem