ONSHORE WIND Β· MISO

Onshore wind project J957, Mercer County

Onshore wind project J957, Mercer County is a 800 MW onshore wind request withdrawn in the MISO interconnection queue, in Mercer County, Missouri, connecting to AMEREN TRANSMISSION COMPANY OF ILLINOIS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J957
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN TRANSMISSION COMPANY OF ILLINOIS
Connection point (POI)
Maywood 345kV Substation
Location
Mercer County, Missouri
Technology
Wind: 800 MW
Total requested
800 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
9 March 2018
Proposed online date
September 2010
Withdrawn
March 2019

Location

Marker shows the centre of Mercer County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem