United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR Β· PJMSolar project AE2-280, Montgomery County
Solar project AE2-280, Montgomery County is a 127 MW solar request withdrawn in the PJM interconnection queue, in Montgomery County, Virginia, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-280
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Claytor Lake-Edgemont 138 kV
- Location
- Montgomery County, Virginia
- Technology
- Solar: 127 MW
- Total requested
- 127 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 29 March 2019
- Proposed online date
- December 2022
- Withdrawn
- March 2024
Location
Marker shows the centre of Montgomery County; the queue data does not give exact sites.
Other requests in Montgomery County
- Battery storage project AG2-518, Montgomery CountyBattery storage Β· 80.0 MW Β· in study
- Solar project AI2-145, Montgomery CountySolar Β· 30.4 MW Β· in study
- Solar + storage project AG2-604, Montgomery CountySolar + storage Β· 94.0 MW Β· withdrawn
- Other project W3-010, Montgomery CountyOther Β· 0.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem