πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OTHER Β· PJM

Other project T177

Other project T177 is a 500 MW other request withdrawn in the PJM interconnection queue, connecting to Unknown.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2008 (completed)
  2. Withdrawn / abandonedJun 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
T177
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Unknown
Connection point (POI)
Belmont-Brighton
Technology
Other: 500 MW
Total requested
500 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 January 2008
Withdrawn
June 2009

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem