United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

OTHER Β· NYISO

Lovett #3 Repowering

Lovett #3 Repowering is a 180 MW other request withdrawn in the NYISO interconnection queue, connecting to CONED.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
58
Grid region
NYISO (New York)
Utility / transmission owner
CONED
Developer
Mirant
Connection point (POI)
Lovett
Location
New York
Technology
Other: 180 MW
Total requested
180 MW
Queue status
Withdrawn
Entered queue
23 March 2000

Location

No county location in the queue data.

Power plants in New York Β· Transmission lines in New York

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem