United States βΊ Grid βΊ Interconnection queues
ONSHORE WIND Β· ERCOTScandia Wind E
Scandia Wind E is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedApr 2014 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 13INR0010e
- Grid region
- ERCOT (Texas)
- Developer
- Scandia Southwest
- Connection point (POI)
- Windmill (79502)
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 29 June 2009
- Agreement signed
- 25 April 2014
- Proposed online date
- July 2017
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem