United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project G419, Lyon County
Onshore wind project G419, Lyon County is a 1.5 MW onshore wind request withdrawn in the MISO interconnection queue, in Lyon County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2004 (completed)
- Withdrawn / abandonedMay 2004 (project stopped here)
- ConsentedMay 2004 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G419
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Unknown
- Location
- Lyon County, Iowa
- Technology
- Wind: 1.5 MW
- Total requested
- 1.5 MW
- Queue status
- Withdrawn
- Entered queue
- 22 March 2004
- Agreement signed
- 10 May 2004
- Proposed online date
- December 2005
- Withdrawn
- May 2004
Location
Marker shows the centre of Lyon County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem